Visit http://www.esabna.com/ for more information about our products.
Leak Testing Flame Check System
- Written procedure for conducting a leak test
- ESAB Flame Check Systems on an ESAB gantry type cutting machine with Vision Control
- Cut OXY
- Go to Bito screen and force to 1 Bitos 68, 69, 71, 96, and Statx bito. Gas should be flowing through torch.
- Go to Process Timer screen and adjust O2 timer to maximum.
- Now force Bito 96 to 0. The main manifold(s) to the station manifold should be fully pressurized.
- Preheat OXY
- Remove X34 from PRCA1 card(s)
- Move X33 to X34 on the PRCA1 card(s).
- Go to Bito screen and force to 1 Bitos 68, 69, 75, 65, and Statx bito. Gas should be flowing through torch.
- Go to Process Timer screen and adjust O2 timer to maximum.
- Now force Bito 75 to 0. The main manifold(s) to the station manifold should be fully pressurized.
- Preheat Fuel Gas
- Remove X33 from PRCA1 card(s)
- Move X32 to X34 on the PRCA1 card(s).
- Go to Bito screen and force to 1 Bitos 68, 69, 64, and Statx bito. Gas should be flowing through torch.
- Go to Process Timer screen and adjust O2 timer to maximum.
- If gas is not flowing, proceed to Process screen and press F4.
- Now with gas flowing through torch, manually shut off Preheat Fuel Gas manual valve on station manifold. The main manifold(s) to the station manifold should be fully pressurized.